PST Group AB has signed a EUR 42 million (incl. VAT) contract with UAB JPresswood for the construction of a complex of industrial buildings in MarijampolÄ—, with the necessary ancillary and energy production buildings, an administrative building with domestic premises and all the necessary engineering infrastructure.
The buildings will have a total area of around 20,000 sq. m and the estimated timeframe for completion of the works is 2 years.Â
The main buildings are designed to be energy efficient class A++. Also the outdoor engineering networks and infrastructure necessary for the functioning of the buildings will be installed, i.e. access roads, parking lots, etc.
More information:
Tomas Stukas
Managing Director
Tel.: +370Â 618 21360