Friday, August 14, 2026
spot_img

DEME takes delivery of new wind turbine installation vessel Norse Wind

DEME has taken delivery of its new wind turbine installation vessel Norse Wind at the CIMC Raffles Shipyard. Designed to install the next generation of offshore wind turbines, the vessel combines advanced technology and sustainable design features to offer unrivalled installation capability.


Attachment

  • P2025 DEME Delivery Norse Wind 20251016 ENG

Powered by SlickText.com

Hot this week

The Master Tape – Navigating $108 Crude Oil & Top Setups in $NVDA, $LLY, $WMB, & $CRDL 

Welcome back, traders! After a phenomenal run in 2025,...

Spirit Blockchain Capital Appoints Interim CEO and Interim CFO

VANCOUVER, BC, April 17, 2026 (GLOBE NEWSWIRE) --...

Zhihu Inc. Files Its 2025 Annual Report on Form 20-F

BEIJING, China, April 17, 2026 (GLOBE NEWSWIRE) --...

25/2026・Trifork Group: Shareholders approve all resolutions at the Annual General Meeting 2026

Schindellegi, Switzerland – 17 April 2026 Trifork Group...

Form 8.5 (EPT/RI)- Gamma Communications Plc

FORM 8.5 (EPT/RI) PUBLIC DEALING DISCLOSURE BY...

Topics

spot_img

Related Articles

Popular Categories

spot_img